SLS 3D printing Târgu Jiu
- Distance from the workshop
- about 510 km
- Route
- DN15 to Bicaz, over the Bucin Pass, A3, A10 and A1 to Simeria, then DN66 via Hațeg, Petroșani and the Jiu Gorge
- Delivery
- courier, usually the next working day after dispatch
- County
- Gorj
Open-pit mines and power plants use kilometres of conveyor belts and a lot of equipment with wear parts. Heavy metal parts can't be replaced with nylon, but with SLS you can make sensor housings, templates and parts for maintenance equipment. Constantin Brâncuși University trains engineers for the energy sector and for machine building.
Parts that suit companies in Târgu Jiu
- Housings for sensors that monitor conveyor belts (speed, slip, roller temperature)
- Templates for cutting and splicing conveyor belts
- Housings for air quality monitoring stations around the mines
Local industries
- energy (lignite and thermal power plants)
- technical rubber and conveyor belts
- industrial maintenance
- metalworking
Technical universities
- Constantin Brâncuși University of Târgu Jiu
Questions from Târgu Jiu
Can delivery to Târgu Jiu take longer?
By road it's about 510 km, through Transylvania and the Jiu Gorge. We dispatch the parcel from Piatra Neamț by courier, and it usually arrives the next working day, sometimes a day later.
Do the housings hold up to the dust and vibration at the mines?
PA12 copes well with vibration and light wear, and housings can be designed with seals that keep the dust out. Areas with explosive atmospheres need special materials and certifications, which we don't offer.
Send your file and get the parts by courier in Târgu Jiu
- Free quote
- No minimum quantity
- NDA on request